Laid to within 40' of box culvert. Started to get ready to wellpoint and set box culvert. Dirt crew truckers. Dirt out today.
Completed 48" HDPE to box culvert location, back-filled and compacted. Staged 8" dewatering pump and hoses for set up tomorrow when fittings arrive. Picked up all MOT not needed and called for pickup. Subcontractor continued pond excavation at south end.
Beau called to check on progress. I told him we would need large chain saw, grapple truck, and trailer tomorrow. We will begin cutting cypress trees, load out 36" RCP from demo operation and hauling them away. Called Larry about a meeting with crane company to determine how much clearing needs to be done for setting the box culvert. Met with city inspector to discuss storm bypass, road closure and top of bank for pond excavation finish grade.
Problems: cut an unmarked phone line and found an unmarked power box no updated locates
Completed 48" HDPE to box culvert location, back-filled and compacted. Staged 8" dewatering pump and hoses for set up tomorrow when fittings arrive. Picked up all MOT not needed and called for pickup. Subcontractor continued pond excavation at south end.
Beau called to check on progress. I told him we would need large chain saw, grapple truck, and trailer tomorrow. We will begin cutting cypress trees, load out 36" RCP from demo operation and hauling them away. Called Larry about a meeting with crane company to determine how much clearing needs to be done for setting the box culvert. Met with city inspector to discuss storm bypass, road closure and top of bank for pond excavation finish grade.
Problems: cut an unmarked phone line and found an unmarked power box no updated locates