Spoil Island Development

TSI was contracted to clear and burn more than seven acres, construct 3,095 linear feet of 7-foot berms, and create a 50-ft outfall ditch on this spoil island near Cocoa Beach for the purpose of the island accepting further dredge material in the future. All equipment was mobilized via barge and TSI provided 24-hour security at the site for the duration of the project.

Progress video of Cocoa Beach Spoil Island