Dig up sewer pipe. 1 MH and about 125' of 24" PVC. Ran into some chips (wood) and tree stumps and looks like trash pile area about 40' long and ditch width is about 25' wide. Trash continues past each side of ditch. See Larry's email.
Continued demo of existing 24" sanitary sewer. Removed 200' of pipe and dug manhole. Back-filled to within two feet of finish grade. All pipe removed so far is loaded and ready to take to the Kissimmee yard.
discovered a section of pipe ditch about 40' long and a 4' layer of buried debris. Jimmy called Beau and we took photos. Also Larry came out with both city inspectors to look at it and take additional photos. Henry stopped by the jobsite while he was in town.
Continued demo of existing 24" sanitary sewer. Removed 200' of pipe and dug manhole. Back-filled to within two feet of finish grade. All pipe removed so far is loaded and ready to take to the Kissimmee yard.
discovered a section of pipe ditch about 40' long and a 4' layer of buried debris. Jimmy called Beau and we took photos. Also Larry came out with both city inspectors to look at it and take additional photos. Henry stopped by the jobsite while he was in town.