August 18, 2013

Pulled both 24" sewer plugs, put down by-pass pumps and ____ up new sewer main. 

 

went into job and fueled wellpoint pump and 330 hoe. pulled sewer plugs in existing MH #1 and MH at lift station. cut sewer loose to flow on its own. shut 12" pump off.