finally set up all equipment at proper locations. Got all parts needed to get everything running. Had to go to lows a few times to get parts to finalize set up for equipment. Mark Had to go first thing this morning to get bracket made for Green screener.
Also picked up Blue dump truck from shop, and took it back to office. picked up little chevy and loaded scaffolding in the back to haul to UNC job.
Found out there was an issue with the slope on the Effluent storage basin pond. Slope was 2 to 1 when it should have been 3 to 1. We put some of the screen dirt that we had already prepared for the clay liner, in the pond to fix the slope issue. Also had to compact the dirt to proper compaction.
Received Bobcat, and both tampers around 4pm from Neff Rental.